STENA EVOLUTION
NAMING CEREMONY IN SOUTH KOREA
On Friday 3 November in Geoje, South Korea, a milestone event unfolded for Stena Drilling, a global leader in offshore drilling, as they celebrated the naming ceremony of its latest vessel, Stena Evolution.
Those who attended the ceremony included Senior Management from Stena Drilling, members from both the Stena AB board and Stena Drilling board, the Stena Evolution crew, and all those who have played an important part in the delivery of Stena Evolution.
This event highlighted the collaborative efforts required to bring such an advanced vessel to reality, factoring in the needs of our global energy market. This included a number of key upgrades focussed on delivering safe and efficient operations for our clients. The vessel’s naming ceremony was not just a milestone for Stena Drilling, being 11 years since the last naming ceremony, but a moment of pride for all those involved in design, construction, commissioning, and everything in between.
Godmother, Elizabet Brock, named the vessel and started the celebrations when she cut the rope with a ceremonial axe, champagne was smashed against the ship, and the name was unveiled on the side of the vessel, with streamers and fireworks marking the moment.
Prior to the ceremony guests enjoyed a tour of the soon-to-be Stena Evolution where they marvelled at the technology and sheer size of the ship. During a lunch which took place after the naming ceremony Stena Drilling’s CEO Erik Rønsberg presented a ’Skean dubh’ (a small, single-edged knife) to Samsung Heavy Industries. A nod to Stena Drilling’s Scottish heritage and location.
The naming of Stena Evolution by Stena Drilling is more than just a label for a new rig; it is a testament to Stena Drilling’s values, goals, and vision for the future of offshore
drilling. Stena Evolution is the next evolution of Stena Drilling’s fleet.
STENA EVOLUTION
The Drilling Unit is a 7th Generation operation-oriented enhanced Ultra Deep Water DP3 Drillship capable of operating in water depths up to 12,000 ft and drilling depths up to 40,000 ft. The Drilling Unit’s premium high specification and optimal design utilises riser storage in hull to offer extensive deck space with a 24,000 MT VDL. Innovative energy and operational efficiencies have been implemented throughout the design to enhance performance. In addition, this vessel is a prime candidate for upgrading for 20,000 psi well operations.